A new reception for Vion

28th April 2010

Author

Nu Image

Our brief for the design and refurbishment of reception was to make the area more welcoming and a stronger reflection of the Vion brand. Out went the existing long established reception counter and one of the largest telephone systems we’ve ever seen!

Our brief for the design and refurbishment of reception was to make the area more welcoming and a stronger reflection of the Vion brand. Out went the existing long established reception counter and one of the largest telephone systems we’ve ever seen! In came a handmade bespoke reception counter, flooring details and bright colours. A ceiling raft with lighting features and a curved feature wall combined to create a contemporary and welcoming reception area.

At the same time we stripped out a part of the existing 1970′s canteen and divided the space into a private meeting/training rooms, air conditioned with a full suite of training meeting furniture.

A Bluespace project manager and site foreman were appointed to insure smooth progress on site and act as immediate interface between client and studio.

We were targeted to complete both refurbishments within less than 4 weeks and delivered on time and budget.

“Thank you very much for all of the teams great efforts to make our reception and training suite come to life!

All areas look fabulous and I am really pleased with the end result. Please pass on my thanks to all of the guys, they have done really well.”

Dawn Smith, Vion Food Group

Bluespace Ltd Testimonials

Bluespace provided us with a highly professional service and pulled out all the stops to help us meet our tight project deadlines. I also valued their clear impartial advice during the design phase of the project. I’d happily recommend them to anyone considering an office fit out or refurbishment.

Mark Fletcher

Cooper Lomaz Recruitment

Bluespace Ltd Testimonials